Powered by Nature A practical path to clean, reliable island electricity.
A staged infrastructure program combining utility-scale solar, rooftop solar, battery storage, and grid modernization — designed to deliver stability, affordability, and measurable impact.
Reliability & Resilience
Grid stability, modern protection, dispatchable storage, and operational controls designed for island conditions.
Long-term Affordability
Reduce exposure to oil price volatility, improve efficiency, and stabilize tariffs with a phased delivery model.
Local Value Creation
Training, jobs, and community access programs so the transition benefits residents and businesses.
Program status & delivery progress
Moving from feasibility into structured delivery — with phase gates, a working team, and active stakeholder alignment.
Feasibility & technical basis
Completed
Feasibility Study (Phase 1) completed; demand & system modelling established; initial solution architecture defined.
Governance & program setup
Active
Core project team established; advisory network engaged; delivery framework defined (phase gates, risk controls, reporting).
Stakeholder alignment
In progress
Conversations underway with key stakeholders; benefits translated into actionable goals; inputs incorporated into the roadmap.
Financing & structuring
In progress
Early-stage investor conversations initiated via trusted network; financing structure and term sheet outline in development; program entity/SPV in preparation.
Where we are now
Phase 1 feasibility has been completed, including demand analysis, system modelling, and initial solution architecture. The program is now transitioning into structured delivery — with governance formalized, a core project team active, and early-stage financing discussions underway.
Next 90 days
- Confirm Phase 2 scope & KPIs (MW/MWh per year + reliability metrics)
- Finalize term sheet outline and financing structure
- Validate priority sites and grid/BESS sizing assumptions
- Publish a formal program update for stakeholders
The Masterplan
A structured 5-year pathway toward fossil-free island electricity — delivered through phase gates to de-risk execution, unlock early wins, and scale with confidence.
System pillars
Roadmap (phase-gated)
Phase 1 — Baseline, controls & quick wins
Data validation, grid fixes, initial storage/control upgrades, and immediate reliability improvements.
Phase 2 — Scale solar + storage
Accelerated PV deployment and BESS rollout for frequency support, peak shaving, and system stability.
Phase 3 — System optimization + grid services
Dispatch optimization, storage integration, advanced grid services, and performance tuning.
Phase 4 — Optimization & reliability hardening
Redundancy upgrades, black-start capability, resilience strengthening, and long-term O&M readiness.
Key targets & outcomes
What “success” means in measurable terms: capacity, storage, stability, and community impact.
Utility PV
~90 MWp total build-out (phased). Designed with curtailment-aware dispatch and grid services.
Rooftop PV
~60 MWp expansion across homes & businesses with safe interconnection standards.
BESS
~200 MWh storage for frequency, peak, spinning reserve replacement, and resilience.
Reliability KPIs
Fewer outages, improved frequency control, and grid protection modernization (Phase 1 unlocks).
Cost stability
Lower dependence on imported fuels reduces volatility and supports long-term tariff stability.
Community impact
Solar-for-All pathways, training programs, and local supply chain participation.
Project planning & current status
High-level view of what’s underway now — details are shared in the full pack on request.
| Workstream | Focus | Output | Phase | Status |
|---|---|---|---|---|
| Feasibility Study — Phase 1 | Technical + economic basis | Masterplan dataset | 1 | Completed |
| Program team & governance | Execution readiness | Operating framework | 1–2 | Active |
| Stakeholder alignment | Utility / public / community | Scope + constraints | 1–2 | In progress |
| Financing & structuring | Structure + term sheet | Investment pathway | 2 | In progress |
| Phase 2 — site validation & sizing | PV sites + BESS sizing | Permitting-ready scope | 2 | In preparation |
Invest
For partners and investors: structured delivery, transparent reporting, and phase-gated risk management.
Partnership
Technology providers, EPC partners, and local delivery capacity.
Project finance
Structured pathways aligned with asset lives and risk controls.
Impact alignment
Measured outcomes for reliability, cost stability, and community value.
Community
A transition that works for everyone — access, affordability, and local capability building.
Solar-for-All
Access models such as pay-as-you-save, leases, targeted subsidies, and community solar options.
Jobs & training
Installer pathways, O&M training, apprenticeships, and local contractor development.
Transparency
Regular updates, milestones, and measurable KPIs for reliability, cost stability, and impact.